幸运彩登录注册

  • <tr id='8JtLIg'><strong id='8JtLIg'></strong><small id='8JtLIg'></small><button id='8JtLIg'></button><li id='8JtLIg'><noscript id='8JtLIg'><big id='8JtLIg'></big><dt id='8JtLIg'></dt></noscript></li></tr><ol id='8JtLIg'><option id='8JtLIg'><table id='8JtLIg'><blockquote id='8JtLIg'><tbody id='8JtLIg'></tbody></blockquote></table></option></ol><u id='8JtLIg'></u><kbd id='8JtLIg'><kbd id='8JtLIg'></kbd></kbd>

    <code id='8JtLIg'><strong id='8JtLIg'></strong></code>

    <fieldset id='8JtLIg'></fieldset>
          <span id='8JtLIg'></span>

              <ins id='8JtLIg'></ins>
              <acronym id='8JtLIg'><em id='8JtLIg'></em><td id='8JtLIg'><div id='8JtLIg'></div></td></acronym><address id='8JtLIg'><big id='8JtLIg'><big id='8JtLIg'></big><legend id='8JtLIg'></legend></big></address>

              <i id='8JtLIg'><div id='8JtLIg'><ins id='8JtLIg'></ins></div></i>
              <i id='8JtLIg'></i>
            1. <dl id='8JtLIg'></dl>
              1. <blockquote id='8JtLIg'><q id='8JtLIg'><noscript id='8JtLIg'></noscript><dt id='8JtLIg'></dt></q></blockquote><noframes id='8JtLIg'><i id='8JtLIg'></i>

                Greece Minos 50MW CSP Project

                Cosin Solar Technology Co., Ltd. (Cosin Solar for short) and CHINA GEZHOUBA GROUP CORPORATION (CGGC for short) as a consortium signed the EPC contract with Nur-MOHHeliothermal S.A. for the project of Greece Minos 50MW CSP project. On 11th November 2019, Chinese President Xi Jinping and Greek Prime Minister Kyriakos Mitsotakis witnessed the exchange of the Multilateral Cooperation Agreement for the project. 

                The project is located in the southeast of Crete island of Greece, which is of abundant solar resources. The total installed capacity of the project is 50MW configured with 5 hours molten salt storage system, the technology of which is independently developed by Cosin Solar.

                In the operation period, the project can provide 10% of local electricity demand with high quality clean energy, which is of great significance to accommodate more clean energy for local island and protect the island's ecological and tourism environment.

                Minos 50MW CSP project is also the first CSP project whose whole life cycle is totally designed, manufactured, constructed, financed and operated by Chinese companies in the international market.


                Item

                Value

                Typical DNI

                2217 kWh/㎡

                Installed Capacity

                50MW CSP+5MW PV

                Storage

                5hours

                Reflective Area

                385,000㎡

                Tower Height

                200m

                Annual Production

                120GWH

                Construction Period

                30 month

                Status

                Financing